Can you spot the cat on my page?

Jiayi Zhou

Jiayi Zhou

About

Jiayi Zhou is an MPhil student at The Hong Kong University of Science and Technology, advised by Prof. Huamin Qu in the HKUST VisLab. Her research interests lie at the intersection of Data Visualization and Human-Computer Interaction. She is curious about how creators "connect the dots" in storytelling amidst the explosion of information. She investigates how advanced Artificial Intelligence, including GenAI and computer vision models, can empower the nonlinear visual storytelling process.

In daily life, Jiayi seeks moments of "connection" with nature, her beloved cat, her body, and like-minded individuals. She aspires to be a dedicated rower, an imaginative designer, and a perceptive photographer. Check out her blog posts: What I Talk about When I Talk about Rowing • Collecting the Dots.

Publications

Corresponding author(s)*
  1. RemiAssist photo-based reminiscence therapy system
    Shuchang Xu, Minglong Tang, Junyan Mao, Xiaofu Jin, Wazeer Zulfikar, Yasith Samaradivakara, Jiayi Zhou, Huamin Qu, Yuling Sun, Pattie Maes
  2. Human-AI co-creation study with screenwriters
    Yuying Tang, Jiayi Zhou, Haotian Li*, Xing Xie, Xiaojuan Ma, Huamin Qu
  3. Loss of Sonnet 18 visual artwork teaser
    Junxiu Tang, Jiayi Zhou, Yifang Wang, Xinhuan Shu, Peiquan Xia, Xiaojiao Chen, Tan Tang, Yingcai Wu
  4. Comparison of Gantt and Stringline visualizations
    Junxiu Tang, Fumeng Yang, Jiang Wu, Yifang Wang, Jiayi Zhou, Xiwen Cai, Lingyun Yu, Yingcai Wu*
  5. Rigel tabular data transformation interface
    Ran Chen, Di Weng, Yanwei Huang, Xinhuan Shu, Jiayi Zhou, Guodao Sun, Yingcai Wu*
  6. Shoes++ detachable sole interaction teaser
    Zihan Yan, Jiayi Zhou, Yufei Wu, Guanhong Liu, Danli Luo, Zihong Zhou, Haipeng Mi, Lingyun Sun, Xiang 'Anthony' Chen, Ye Tao, Yang Zhang, Guanyun Wang*

Service

Reviewer
HCI/VIS: CHI [2024–2026], UIST [2026], PacificVis [2026] CV/CG: SIGGRAPH Asia [2026], CVEU@CVPR [2025]
Teaching
HUMA 1160, Weiqi and Chinese Culture [2025 Fall, 2026 Spring]
Volunteer
CHI [2026]